Next Page |
Previous Page |
Index
TRANSITION FROM RAMP TO GROUND
Option A:
Working over dirt, remove enough dirt to allow modules #5 and #6
to maintain the proper slope for a smooth transition to ground level.
A 42"-long 2x6 is laid underneath the end of Module #6, and another
under the junction of Modules #5 and #6. The lower two sets of 4x4's
are set into the ground to a depth of 24".
The newly cut end of any piece of treated lumber that will be in ground
contact should be protected with a fence post preservative type of product.
Uncut ends do not need extra protection. Consult with the lumberyard
where you purchased the lumber for advice on specific products.
Next Page |
Previous Page |
Index